» Published on
Maintenance is now considered as completed. Don't hesitate to contact us on support if you notice any problems.
» UpdatedThe last public IP address 80.247.13.145 has been processed, we are now performing post-operation checks.
» UpdatedThe public IP address 80.247.12.255 has been processed, there are one last public IPs to be addressed.
» UpdatedPublic IP address 185.21.194.105 has been processed, 2 remaining public IPs need to be addressed.
» UpdatedThe operation was successfully executed on the public IP address 148.253.96.193. There are 3 remaining public IP addresses to be processed.
» UpdatedThe first stage of the operation has just been completed. The second part of the operation is now underway, we'll be working on each of our public IP addresses successively, possibly causing some network disruption (packet loss, slower performance).
» UpdatedThe maintenance operation has started. We will keep you informed of the progress of the operation on our status page: https://scalingostatus.com/details/3a15043a5c7cf
» UpdatedPlanned maintenance will take place on the osc-secnum-fr1
region on March 7, 2024 from 20:00 CET to 22:00 CET. During this maintenance, the network access to the region will be degraded. The aim of this operation is to improve the stability and security of our network architecture.
You can follow the maintenance process and subscribe to updates through our status page: https://scalingostatus.com
Impact:
If you have any question, do not hesitate to reach us through the in-app support.
» Updated